The Mindanao Project The Mindanao Power Plant Project will address the challenge of attaining stability of electricity supply in Mindanao and sustain its economic growth. Since commercial operation in December 2006, the power plant provides additional electricity representing 15% of the island’s total power demand. Facts and Figures Project Scheme: Build-Operate-Transfer (BOT) over a 25-year cooperation period with the National Power Corporation Project Components: 2 units of 105MW (net) Coal-Fired Thermal Units (installed capacity: 232MW) Six-kilometer 138kV Transmission Line Five-kilometer underground raw water pipeline Project Volume: US $ 305 million Partners: STEAG GmbH (89 %) State Investment Trust, Inc. (11%) Fuel: Imported hard coal / Local coal Coal yard capacity: 150,000 tons Start of construction work: December 01, 2003 Start of commercial operation: November 15, 2006 Location: PHIVIDEC Industrial Estate, San Martin-Balacanas, Villanueva / Misamis Oriental
Facts and Figures
Build-Operate-Transfer (BOT) over a 25-year cooperation period with the National Power Corporation
2 units of 105MW (net) Coal-Fired Thermal Units (installed capacity: 232MW) Six-kilometer 138kV Transmission Line Five-kilometer underground raw water pipeline
PHIVIDEC Industrial Estate, San Martin-Balacanas, Villanueva / Misamis Oriental